Customization: | Available |
---|---|
Type: | Seamless |
Technique: | Cold Drawn |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
auto spare part precision tube:
1. MOQ:5MT
2. DN:3/8"-10"
3. Annealed pipes
4. Tolerance:OD +/-0.05-0.20mm
auto spare part precision tube specifications
Standard |
ASTM, BS, JIS, DIN,GB |
Steel Grade |
ASTM A53 A-A106B,SAE1045, GB 10#-45#,DIN st35-st45,BS 1387,JIS S45C |
DN |
3/8"-10" |
W.T. |
2mm-25mm |
Length |
1-6m |
End protection |
plastic caps |
Packing |
Wrapped in bundles by steel strips |
Delivery |
by container |
Third party inspection |
SGS/BV |
Production Capacity |
200,000tons per year |
Delivery time |
20 days |
Application |
Machinery, road and construction fields, lifter, tower crane, |
Main market |
Asia, India, Middle East, America, Europe |
DIN St37.4
Chemical Composition(%) | Mechanical Property | |||||||||
C | Si | Mn | S | P | Cr | Ni | Cu | Mo | Yield Strength | Tensile Strength |
( σs ) | ( σb ) | |||||||||
0.07~0.17 | 0.15~0.35 | 0.40~0.70 | ≤0.025 | ≤0.025 | ≤0.15 | ≤0.25 | ≤0.25 | / |
≥235 (MPa) |
≥315 |
(MPa) | ||||||||||
End Shape | Beveled end, plain end, vanished, or adding plastic caps to protect the two ends as per customer's requirements | |||||||||
Surface | Oiled, Galvanized, Phosphate etc | |||||||||
Treatment | ||||||||||
Technique | Cold drawn | |||||||||
Application | 1. Automotive and mechanical pipes | |||||||||
2. Petroleum cracking pipes | ||||||||||
3. High Pressure Boiler Pipe | ||||||||||
4. Low and middle pressure fluid transportation pipeline | ||||||||||
5. Chemical fertilizer equipment pipes | ||||||||||
6. Heat exchanger pipes | ||||||||||
Delivery | 1. BK (+C) | No heat treatment after last cold forming process. | ||||||||
Conditions | 2. BKW (+LC) | After last heat treatment there is a light finishing pass (cold drawing) | ||||||||
3. BKS (+SR) | After the final cold forming process the tubes are stress relieve annealed. | |||||||||
4. GBK (+A) | After the final cold forming process the tubes are annealed in a controlled atmosphere. | |||||||||
5. NBK (+N) | After the final cold forming process the tubes are annealed above the upper transformation point in acontrolled atmosphere. | |||||||||
Package | 1. Bundle Packing. | |||||||||
2. Plain end or vanished as per customer's request. | ||||||||||
3. Wrapped in waterproof paper. | ||||||||||
4. Sackcloth with several steel strips. | ||||||||||
5. Pack in heavy tri-wall boxes. |